Our projects
- Quantity:
60 000 m3 of contaminated soil
300 000 m3 of groundwater pumped
3 000 m of burried structures
- Operations : Drain and treatment of burried structures (grids and foundations)
Excavation and treatment of contaminated soil
Pumping and lowering of the water table